Avalon

Avalon
Specifications:
Finish: Avery Linen Reversed Raised Center Panel Door.
European Style Fully Concealed Soft-Closing Hinges. 3/4" Adjustable Shelves.
Full Overlay Doors and Drawers. 1/2" Thick Grade Plywood Box Construction.
Full Extension Soft-Closing Under-Mount Glide System. Five Piece Door and Drawer Face.
Clear Coated Natural Maple Finish Interior.

Avalon 10x10 Kitchen Starting :

$3,234.49 $2,154.23
AL-B12,AL-B36,AL-B36,AL-SB36,AL-W1230,AL-W3630,AL-W3630,AL-W3624,AL-TK8
Select a category below to begin adding items to your shopping cart or scroll below for a list of all available items.
Waste Basket
Model Description Price Quantity  
AL-WBS18-2

Avalon - Waste Basket 18"-2 Insert (Order 2 Rv358) - 14 1/4" W X 17 1/2" H X 21"D With 2 Trash Cans (Each 35 Qt)

Special Price $90.57 Regular Price $135.98
Trash Can Rv358
Model Description Price Quantity  
AL-RV358

Avalon - Trash Can Rv358 - 14 3/8" W X 17 1/8" H X 10 1/2"D

Special Price $29.68 Regular Price $44.56
Utensil Drawer
Model Description Price Quantity  
AL-UD15

Avalon - Tiered Double Cutlery Drawer For 15" Cabinet - 11 1/4" W X 21" H X 4"D

Special Price $129.72 Regular Price $194.76
AL-UD18

Avalon - Tiered Double Cutlery Drawer For 18" Cabinet - 14 1/4" W X 21" H X 4"D

Special Price $155.08 Regular Price $232.85
AL-UD21

Avalon - Tiered Double Cutlery Drawer For 21" Cabinet - 17 1/4" W X 21" H X 4"D

Special Price $174.42 Regular Price $261.89
AL-UD24

Avalon - Tiered Double Cutlery Drawer For 24" Cabinet - 21 1/4" W X 21" H X 4"D

Special Price $187.99 Regular Price $282.26
Touchup Kit
Model Description Price Quantity  
AL-TOUCHUP KIT

Avalon - Touch Up Kit - 2" W X 8" H X 3/4"D

Special Price $29.68 Regular Price $44.56
Spray Can
Model Description Price Quantity  
AL-SPRAY CAN

Avalon - Spray Can - 2 1/2" W X 2 1/2" H X 8"D

Special Price $39.58 Regular Price $59.42
Page
per page