Avalon - WBS18-2

Avalon - WBS18-2

$135.98
$90.57
In Stock
SKU#: AL-WBS18-2
QTY
Avalon - Waste Basket 18"-2 Insert (Order 2 Rv358) - 14 1/4" W X 17 1/2" H X 21"D With 2 Trash Cans (Each 35 Qt)
  • Description

    Avalon - Waste Basket 18"-2 Insert (Order 2 Rv358) - 14 1/4" W X 17 1/2" H X 21"D With 2 Trash Cans (Each 35 Qt)

  • Additional information

    <div class="w-full flex flex-col"><div class="flex flex-row gap-4 mb-3 last:mb-0"> <div class="text-sm font-semibold text-left flex-shrink-0 min-w-[30%]">Weight</div> <div class="text-sm text-[var(--color-font)] flex-1">19.00</div> </div></div>